Margain

Reorder Point & Safety Stock Simulator

Calculate the exact inventory threshold to trigger supplier purchase orders before stockouts occur, accounting for lead time variance and supplier cash terms.

Inventory & Supplier Inputs

Sales Velocity & Lead Times

Determine the exact stock threshold to issue a new purchase order without tying up excess cash.

25
850
45d
15d
Presets:
$18

Total landed cost per unit including manufacturing, international freight, and customs.

Inventory Decision StatusReorder Now

Exact Reorder Point (ROP)

1,500units remaining

Your current stock (850) is at or below the reorder point. Place a purchase order now so goods arrive before stockouts.

Days of Stock Left

34d

At 25 units/day

PO Working Capital

$27,000

To produce 1,500 units

Share numbers with your team:
The Manual Spreadsheet Reality:

A calculator models one SKU in isolation. In reality, sales velocity fluctuates across dozens of products. Margain connects to your Shopify inventory and daily sales velocity to automatically project reorder dates across your entire catalog before stockouts occur.

Mathematical & Operational Guide

How the Math & Economics Work

Understand the exact equations, managerial accounting rules, and unit economics governing these metrics in modern e-commerce.

The Standard Reorder Point Formula
Reorder Point (ROP) = (Lead Time Days × Average Daily Sales) + Safety Stock Units

Lead Time Demand covers all customer orders expected to occur while your factory manufactures and ships new inventory. Safety stock acts as an operational cushion against supplier delays, port congestion, or sudden sales surges.

Verified operational finance formulation
Worked Example: Managing a 45-Day Ocean Freight Lead Time
Average Daily Sales Velocity

Rolling 30-day baseline

25 units / day
Supplier Production & Transit

Factory to warehouse dock

45 days
Lead Time Order Demand

25 units × 45 days

1,125 units
Safety Stock Buffer (15 days)

Buffer for logistics delays

375 units
Unit Landed Cost

Manufacturing + freight + customs

$18.00
Calculated Reorder Point

When inventory reaches 1,500 units, trigger your purchase order immediately to receive goods before safety stock is breached.

1,500 Units ($27,000)
Scenario figures based on declared parameters

The Supplier Payment Milestone Cash Float

Inventory cash requirements rarely occur in a single transaction. Factories typically demand a 30% upfront deposit to initiate production, and the remaining 70% upon bill-of-lading (B/L) release before shipping. Operators must model this staged cash outflow against daily sales collections to avoid operating liquidity squeezes.

Frequently Asked Questions

Margain Platform Automation

Automate Inventory Velocity with Margain Commerce Engine

Connect your Shopify catalog to Margain to continuously sync inventory levels, monitor daily SKU run rates, and forecast reorder dates before stockouts disrupt cash flow.

Explore Commerce Engine

Related Guides & Playbooks

Deep-dive operational frameworks explaining the unit economics, cash cycles, and marketing attribution behind this calculator.

More Free Commerce Calculators

Explore adjacent tools to stress-test your margins, discount thresholds, CAC payback velocity, and platform fees.

Advertising

E-Commerce Break-Even ROAS Calculator

Input your gross margins and transaction fees to calculate the exact return on ad spend needed to stay profitable.

Launch Simulator
Profitability

True Profit Margin Calculator

Calculate gross, operating, and net profit margins after accounting for COGS, shipping, ad spend, and gateway overhead.

Launch Simulator